top of page

Jinghan Liu_PPJs_wk08


This week I finished 2 more posters, and create a short 2D animation for the sell video opening introduction. There is no actual difficult with this week, but make the animation is takes me long time to do it. I used the Photoshop to animate the mascot, and draw the spot light , then add the files into the AfterEffect to add more details and tweak it. Upload to the Perforce is another small problem, because of the file size is big it takes really long time to upload. Also, when I fix the spell of the logo I found that my psd file for the logo doesn’t have the separate files for each text, so it takes longer time than I thought. For the website update, the only thing is when finish with the edit I forgot to save it, so I did the same things twice.

Breakdown:

Virtual meeting: 0.5 hr

Before class meeting: 1.5 hr

Poster: 1.5 hr

Animation: 4 hr

Fix the logo: 1 hr

Total: 8.5 hrs

Positive:

The poster is completely done

The logo is fixed

Negative:

May be need some changes in the animation? not sure yet.

I totally forget about the font

Featured Posts
後でもう一度お試しください
記事が公開されると、ここに表示されます。
Recent Posts
Archive
Search By Tags
まだタグはありません。
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page